Workspace

This project was completed within an extremely tight schedule. All produced in-house over the course of one weekend, the Report was proofed, printed, folded, and PUR bound over two days and delivered for a Monday morning meeting to its location.

Finishes include tricky tip-in pages interspersed throughout the Report which required continuous monitoring.

It would not have been possible to produce this Report to the required standard in the scheduled time-frame without all of the in-house production facilities available to us. This also allowed us to have full control over the whole process from beginning to end with minimal scope for errors.

The client was thrilled with the result, particularly the time keeping and the quality of the Report.